Before You Begin Splicing
|
| |
|
1. Power to conveyor is disconnected |
| |
|
2. Wearing safety glassess |
| |
|
3. Correct replacement belt selected |
| |
|
4. Correct tools on hand |
| |
|
5. All tensioning mechanisms released |
| |
|
6. Belt threaded onto conveyor right (smooth) side up |
| |
|
7. Loop edges curve back away from direction of belt travel |
| |
|
8. Belt edges tied together with wire, twine, plastic wire tie |
| |
|
|
|
Yes
|
No
|
After Splicing/Installation Completed
|
| |
|
9. Check drive sprocket alignment for 1/8" to 3/16" clearance with Z-bends |
| |
|
10. Check sprocket teeth alignment (Not needed if shaft "keyed" |
| |
|
11. Check position of wear strips and adjust if making contact with Z-bends (belt joints) |
| |
|
12. Check belt tracking in grooved end rolls and transfer rollers |
| |
|
13. Retighten/adjust tension |
| |
|
14. Test tracking by running belt without product; adjust belt |
| |
|
15. Check for proper disposal of old wire and all wire pieces |
| |
|
16. Tools returned to proper storage location |
| |
|
|
|
Yes
|
No
|
Conveyor Safety Check
|
| |
|
17. Are operating insttructions clearly listed and posted? |
| |
|
18. Are safeety guards adequate to prevent accident and injury? |
| |
|
19. Are limit switches and alarms working? |
| |
|
20. Personnel know location of emergency stop/control switches? |
| |
|
|
|
Yes
|
No
|
Routine maintenance Inspection/Evaluation
|
| |
|
21. Check belt surface for bent or broken wire strands; straighten or repair immediately |
| |
|
22. Check splice clips (if used) for wear/damage |
| |
|
23. Check all conveyor components for excessive wear (drive sprockets, blanks, wear strips, etc.); replace if needed |
| |
|
24. Check sprocket alignment for 1/8" to 3/16" clearance |
| |
|
25. Check sprocket teeth alignment (Not needed if shaft "keyed") |
| |
|
26. Check position of wear strips and adjust if making contact with Z-bends (belt joints) |
| |
|
27. Check belt tracking in grooved end rolls and transfer rollers |
| |
|
28. Check tension; adjust tension mechanisms as necessary |
| |
|
29. Check levelness of conveyor frame |
| |
|
30. Test tracking by running belt slowly without product |